CalWest ManufacturingRobotics Fontana, CA

Call or text (818) 397-4809

Injection molding automation for the work after the mold opens

The molded-part work we can point to is assembly. LR Mate robots in cells we built assemble spray nozzles from molded parts at a plant in Temecula, CA. This page covers where robots fit at the press and downstream of it.

Molded-part work
Spray nozzle assembly from molded parts
Robots
FANUC LR Mate
Part feeding
Bowl feeders
Fingers
Machined in-house to fit the part
Built in
Fontana, CA
Machined aluminum gripper fingers on a blue gripper body holding a white molded part above an orange molded spray nozzle part seated in its fixture
Fig. 1Fingers machined in our shop holding a molded part over the nozzle body in its fixture, in one of the spray nozzle assembly cells. Temecula, CA.
Molded-part work
Spray nozzle assembly from molded parts
Robots
FANUC LR Mate
Part feeding
Bowl feeders
Fingers
Machined in-house to fit the part
Built in
Fontana, CA

Injection molding automation starts at the press, but in many molding plants most of the labor comes after it: cutting gates, checking parts, assembling them and packing them. The press side often already has a take-out device. The hand work downstream is where people still stand at every machine.

The molded-part work CalWest Robotics can point to is downstream. At a Temecula, CA plant belonging to a national lawn and garden brand, LR Mate robots in cells we built assemble spray nozzles from molded parts at three guarded tables, with bowl feeders supplying the parts.

In short

Injection molding automation covers taking parts out of the mold and the work done to them afterwards: degating, inspection, assembly, stacking and packing. A sprue picker or a top-entry take-out robot pulls the shot from the mold. A six-axis robot fits when the part has to be turned, presented to several stations or assembled. The press and the robot exchange signals such as mold open and mold area free, often over a EUROMAP 67 interface.

Sprue picker vs six-axis robot vs take-out robot

Three kinds of machine show up around a molding press, and they do different jobs.

Sprue picker Top-entry take-out robot Six-axis robot
What it does Pulls the sprue or runner and drops it in a grinder or bin Takes the shot out of the mold and sets it down beside the press Takes parts from the mold or a conveyor, then turns, presents and places them
Where it mounts On the press On the press, traveling over it On the floor or a riser beside the press, or downstream
How it moves A simple swing or stroke Straight-line axes, often with a wrist rotation Six axes, any orientation within its reach
Suits Runner removal Fast, repeated removal and stacking Degating, insert loading, assembly, inspection, packing

A common split is a take-out device at the press and a FANUC six-axis robot downstream, where the part has to be handled in more than one direction. A six-axis robot can also reach into the mold itself when the layout and the cycle allow, which saves a handoff but puts the robot inside the press’s safeguarded area.

How does a robot talk to an injection molding machine?

A robot working at a press has to know when the mold is open far enough to reach in, and the press must not close while the robot is in the mold area. EUROMAP 67, a technical recommendation from EUROMAP, defines that electrical interface between an injection molding machine and a handling device or robot.

Signals go both ways. The press reports states such as mold open position and ejector position, along with two-channel emergency stop and machine safety device signals. The robot reports mold area free and gives permissions such as enable mold closure and enable ejector forward and back. EUROMAP also publishes EUROMAP 67.1 for shuttle and turntable machines, EUROMAP 73 for connecting external safety devices, and EUROMAP 79, an OPC UA interface for data exchange between molding machines and robots.

Not every press has the interface fitted, and older presses may need it added. The make, model and controller of each press are among the first things we ask for. A robot reaching into a mold is also the main hazard at the press, so the press’s own guarding and the robot cell’s safeguards have to be tied together, which we work out from a risk assessment of the cell.

Downstream of the press: degating, assembly, inspection and packing

  • Degating. The robot presents the part to a fixed cutter, or carries a cutter on its gripper, to remove the gate. Heated or ultrasonic cutting is another option, depending on the resin and the finish needed at the gate.
  • Assembly. Molded parts snapped, pressed or stacked together. This is our molded-part work, described below.
  • Inspection. A camera checks for short shots, flash, missing features or the wrong color, and the cell sorts rejects out. Machine vision inspection covers lighting, checks and reject handling.
  • Packing. Parts counted into boxes, bags or trays in a set pattern. Robotic case packing covers packing patterns and the equipment around the robot.

Molded part assembly: the Temecula cells

Each of the three assembly tables is fed by bowl feeders. The bowl vibrates molded parts up a spiral track that rejects any part facing the wrong way, and the parts leave lined up at a pick point, one at a time. LR Mate robots pick them and build the nozzle in fixtures on the table (Fig. 2). On a bowl-fed cell, the operator’s usual job is keeping the bowls topped up and clearing the odd jam, not handling each part.

Stainless vibratory bowl feeder full of yellow molded parts, with parts lined up on its spiral track and FANUC robots and blue fixtures on a round table behind it inside a guarded cell
Yellow FANUC LR Mate robot wrist with a machined gripper placing an orange molded spray nozzle part into a nest inside the assembly cell
Fig. 2A bowl feeder full of molded parts inside one of the assembly tables (left), and an LR Mate robot setting an orange molded part into its nest (right). Temecula, CA.

Bowl feeding suits small rigid parts that run in steady volume, because the feeder orients them mechanically and the robot always picks from the same spot. The tradeoff is that feeder tooling is made for one part shape. Each table is interlocked and light-curtained, and the control panels and operator screen are ours. The spray nozzle assembly cells write-up has the full job, and robotic assembly cells covers part feeding and changeovers in general.

Gripping molded parts

Molded parts rarely have flat, parallel faces for a catalog jaw. On the Temecula cells we designed the fingers around the part and machined them in our shop (Fig. 1), so they square the part up as they close and set it in the fixture where the program expects it. If the part is revised, a new set can be machined here the same week. Our end-of-arm tooling page shows how we build grippers.

A few things about plastic parts shape the gripper:

  • Parts leave the mold before they have fully cooled, so a hard squeeze can mark or distort them.
  • Light parts can cling to a gripper with static, so the release needs to be checked, not assumed.
  • Vacuum cups work on flat, closed faces. Textured, ribbed or vented parts usually need fingers.

Color, resin and mold changes

A color change on the same part mostly means clearing the old color out of the feeders and tracks and keeping track of which color is running. The operator screen on our Temecula assembly cells shows color changeover next to each table’s cycle time and fault status. A mold change is bigger: a new part shape needs its own gripper, nest and program, so list every mold you want the cell to run before design starts.

We design, fabricate, wire and program every cell in our Fontana shop, run it off here, and install it at plants anywhere in the US. Every application we build is on robot cells by application, and the plants we have built for are on industries.

What to send us for a molding cell

  1. Part drawings or models, for every mold and color you want to run
  2. A phone video of the work at and after the press, start to finish
  3. The make, model and controller of each press, and whether it has a robot interface
  4. Cycle time per shot and number of cavities
  5. How parts leave the press today: dropped, conveyed or taken out
  6. A floor sketch of the press and the space around it

Common questions

Do we need a robot at the press, or only downstream?
It depends on where the people are today. If an operator stands at the press only to catch parts and drop them in a box, a take-out device or a conveyor under the mold may be enough. If they degate, check, assemble or pack each shot, that downstream work is usually where a six-axis robot pays off. Many cells combine both: a take-out at the press and a robot downstream.
What is EUROMAP 67?
EUROMAP 67 is a EUROMAP technical recommendation for the electrical interface between an injection molding machine and a handling device or robot. It defines the signals each side gives the other, such as mold open position and mold area free, plus two-channel emergency stop and machine safety signals. Check whether your press has the interface fitted before planning a robot at it.
Can a robot handle parts while they are still warm from the mold?
Yes, with care. Parts come out of the mold before they have fully cooled, so a gripper that squeezes too hard can mark or distort them. Fingers shaped to the part spread the grip, and vacuum cups work on flat faces. Where a part has to cool before it is assembled or measured, the cell can hold it on a cooling conveyor or nest first.
Can one robot serve two presses?
Sometimes. It works when the two cycles leave the robot enough time for both, the presses sit close enough for it to reach both pick points, and there is room for guarding around both. If either press runs a fast cycle or the parts need several steps after removal, a robot per press is usually simpler to run and to fault-find.
Can the same cell run parts from different molds?
Often, if the parts are planned in from the start. Each part needs a gripper that holds it, a nest or fixture that locates it, and its own program. Color changes on the same part are simpler: on our spray nozzle assembly cells, the operator screen includes color changeover next to cycle time and fault status. List every mold and color you want the cell to run before design.

Sources

  1. EUROMAP: Technical recommendations (EUROMAP 67, 67.1, 73 and 79)
  2. EUROMAP 67: Electrical interface between injection moulding machine and handling device / robot, version 1.11 (May 2015)

Start a project

Bring us the process. We'll bring the cell.

Send a phone video of the manual process, or a part drawing, by text or email. We come back with a cell concept and a plan: robot, tooling, controls and code.

Call or text
Call or text
(818) 397-4809
Email
sales@calwestmfg.com
Shop
13815 Arrow Rte, Fontana, CA 92335
Hours
Mon–Fri 7:00am – 3:45pm

FANUC Authorized System Integrator (ASI). Part of CalWest Manufacturing, founded 2012: AS9100D and ISO 9001 certified, ITAR registered.