CalWest ManufacturingRobotics Fontana, CA

Call or text (818) 397-4809

Robot integrator for Nevada, from Las Vegas to Reno and Sparks

Las Vegas is about 225 miles from our Fontana shop on I-15, and Reno about 450 miles by road. We build the cell here and install it at your plant or distribution center.

Nevada’s industrial economy is smaller than California’s or Arizona’s, but parts of it are highly concentrated: big warehouse and distribution operations in both the south and the north, and a cluster of large plants east of Reno and Sparks. We work as a robot integrator for Nevada from our shop in Fontana, about 225 miles from Las Vegas on I-15. Each cell is designed, fabricated, wired and programmed there, run off with your parts, then trucked to your site and installed by the team that built it.

In short

CalWest Robotics builds FANUC robot cells for Nevada plants and distribution centers in our shop in Fontana, CA, about 225 miles from Las Vegas and 450 from Reno by road. We design, fabricate, wire and program the cell, run it off in our shop with your parts, then ship it and install and commission it on site. Cells we install can be reached over a secure VPN when you allow it.

Nevada’s industrial economy, by the numbers

By the Bureau of Labor Statistics’ annual count, Nevada had about 67,700 private manufacturing jobs in 2025, about half the national share of employment. Two figures stand out against that:

  • Warehousing and storage employed about 42,100 people, more than twice the national share. Clark County accounted for about 28,300 of them and Washoe County for about 9,700.
  • Electrical equipment manufacturing employed about 14,900 people statewide, more than three times the national share.

Then there is Storey County, along I-80 east of Sparks. Manufacturing accounted for about 15,200 of the county’s roughly 21,500 jobs in 2025, nearly nine times the national share, at fewer than 40 private manufacturing establishments. Washoe County, around Reno and Sparks, added about 13,800 manufacturing jobs. In Clark County, manufacturing was a small part of a large economy, about 30,700 jobs, spread across miscellaneous products, food, fabricated metal and printing.

The state’s own economic development office lists manufacturing and logistics among its target industries, with warehousing, wholesaling and multi-modal hubs named under transportation and logistics.

Robot cells for distribution and fulfillment

Inside a distribution center, a robot spends its day on cases, totes and pallets. Our palletizing cells grip each case at the end of a line, turn it and place it to the stack pattern, layer by layer; we built them for a national lawn and garden brand’s plant in Temecula, CA. Taking loads apart again is its own problem, with shifted cases, slip sheets and mixed SKUs, covered on robotic depalletizing.

Most of the integration work sits around the robot rather than in it. The cell has to agree with the conveyors and sorters on either side of it about when a case is ready, when it has been taken and what to do when the line downstream backs up. Conveyor integration covers the photo eyes, accumulation and handshakes, and robotic material handling covers moving product between conveyors, racks and fixtures.

Robot cells for Nevada plants

For the plants, the fit depends on the product more than the place. Electrical equipment lines tend to need assembly, handling and inspection of parts that must not be dropped, scratched or put in backwards. We’ve built LR Mate robot assembly cells with bowl feeders and fingers machined in-house to fit the part, and we integrate cameras for both guiding the robot and checking the part. In food and printing plants, two of Clark County’s larger manufacturing industries, the robot work is often at the end of the line: cases packed and cases palletized.

Las Vegas is a drive; Reno is a longer trip

The two halves of the state are different trips from Fontana. Las Vegas is about 225 miles up I-15, close enough that your team can drive down for the run-off in our shop and our team can drive up for the install. Reno is about 450 miles by road, a long day’s drive or a short flight; visitors to the run-off can fly into Ontario International Airport, about 10 miles from the shop.

Either way, the run-off is where changes cost the least, because the frame, panel, gripper and code were all made in the building. On site, power, air, anchoring and network should be ready when the crew arrives. How a project works with us has the stages and what we need from you at each.

Pick the install window first and plan back from it. A distribution center may not be able to take a line down during its busiest shipping weeks, and a plant may only stop for a planned shutdown. The FANUC robot and other long-lead parts, the build, the run-off and the freight all have to fit before that date, so tell us the window on the first call.

After the cell is running

Cells we install can be reached over a secure VPN connection for program changes and troubleshooting, when your plant allows it. Some work still needs hands at the cell, and from Fontana that means a planned trip. Agree on support terms before the PO, especially if your site runs around the clock, as many distribution centers do.

To start, send a phone video of the operation or a list of the cases and pallets involved, or call or text (818) 397-4809. The contact page has our email and address.

Common questions

Do you have an office in Las Vegas or Reno?
No. Our only shop is at 13815 Arrow Rte in Fontana, CA, about 225 miles from Las Vegas and about 450 miles from Reno by road. Every cell is designed, built, wired and programmed there and run off with your parts before it ships. The same team then travels to install and commission it at your plant or warehouse.
Can a robot palletize mixed cases in a distribution center?
It can, but mixed loads are much harder than a single SKU per pallet. The robot needs to know each case's size and where it goes, usually from your warehouse system or a camera, and the stack pattern has to be worked out case by case. Send a list of case sizes, weights and how often the mix changes, and we'll say plainly whether a robot fits.
What do you need from our IT team for remote support?
A decision on whether outside access is allowed, and how. Cells we install can be reached over a secure VPN connection for program changes and troubleshooting when the plant allows it. Some sites allow it any time, some only while someone on site is watching, and some not at all. Settle it during the design review, so the panel and network are built for the answer.
Do you work on FANUC robots another company installed in Nevada?
We service and reprogram FANUC robots other companies installed, not only our own: teaching a new part, adding iRVision, moving a robot or finding out why a cell has stopped. Call or text (818) 397-4809 with the robot model, the controller and what it needs, and we'll tell you whether it needs a trip. We don't publish response times or a service radius.

Sources

  1. BLS QCEW: 2025 annual averages, Nevada (CSV)
  2. BLS QCEW: 2025 annual averages, Clark County (CSV)
  3. BLS QCEW: 2025 annual averages, Washoe County (CSV)
  4. BLS QCEW: 2025 annual averages, Storey County (CSV)
  5. BLS: QCEW location quotient details
  6. Nevada Governor's Office of Economic Development: Target industries

Start a project

Bring us the process. We'll bring the cell.

Send a phone video of the manual process, or a part drawing, by text or email. We come back with a cell concept and a plan: robot, tooling, controls and code.

Call or text
Call or text
(818) 397-4809
Email
sales@calwestmfg.com
Shop
13815 Arrow Rte, Fontana, CA 92335
Hours
Mon–Fri 7:00am – 3:45pm

FANUC Authorized System Integrator (ASI). Part of CalWest Manufacturing, founded 2012: AS9100D and ISO 9001 certified, ITAR registered.