Robot integrator for Los Angeles County plants
Los Angeles County has more manufacturing jobs than any other county in California. We build robot cells for its plants in Fontana, about 47 miles east of downtown LA by road.
As a robot integrator serving Los Angeles, we work from one shop in Fontana, about 47 miles east of downtown by road. CalWest Robotics designs, fabricates, wires and programs FANUC robot cells there, runs each one with the customer’s parts, and then installs and commissions it at the plant. For an LA County plant, everything from the first floor visit to the install is a same-day drive.
In short
What Los Angeles County makes
By the Bureau of Labor Statistics’ count, private employers in the county had about 301,800 manufacturing jobs at some 11,700 establishments in 2025, roughly a quarter of all manufacturing jobs in California. The BLS monthly survey for the Los Angeles-Long Beach-Glendale area, which covers the county, showed about 297,000 in September 2026.
The mix is wide. Four parts of it stand out:
- Aerospace products and parts makers employed about 52,100 people, a little over three times the national share of jobs in that industry.
- Food manufacturing employed about 38,400.
- Fabricated metal product makers, a category that covers machine shops, structural and sheet metal fabricators, and coating and heat treating, employed about 36,400.
- Apparel makers employed about 18,800, around eight times the national share.
Which robot cells fit Los Angeles plants?
Aerospace and defense suppliers
The jobs that suit a robot are repetitive and exacting: drilling and trimming parts, tending machines, handling parts between operations, checking features with a camera. In one cell we built, a FANUC robot puts hundreds of precise holes into complex 3D parts, with a vision system checking each hole and logging the result. For an aerospace supplier we built an automated tapping machine with no robot in it at all. Our parent company, CalWest Manufacturing, is AS9100D and ISO 9001 certified and ITAR registered. More on aerospace automation.
Food plants
We’ve built cells that move raw dough between trays and racks on a live bakery floor, delta robots with soft-touch grippers that don’t mark the dough, and washdown-rated FANUC robots in stainless guarding. The design starts with your sanitation program. See food and beverage automation.
Metal shops
CalWest Manufacturing is a metal shop itself, with laser cutting, bending, welding and 5-axis machining in our building. We build FANUC weld cells and machine tending cells, and the fixtures a robot welds against are made in the same building as the cell. See metal fabrication automation.
Apparel and other packed goods
Sewing is still hard to hand to an industrial robot arm. The end of the line is a different story: cartons coming off a packing line and going onto pallets are steady, repetitive work. Our palletizing cells do that job at the end of each packaging line at a lawn and garden plant in Temecula.
Getting a cell into an older building
If your plant is in an older, tighter building, the questions on install day are physical ones: does the robot base fit through the door, will the arm clear the ceiling at full reach, can the slab take the anchor bolts. The answers belong in the SolidWorks model before any steel is cut.
Measure these before the design review
- The narrowest door or dock opening between the truck and the cell's spot, width and height
- Clear ceiling height at the spot, under any beams, ducts, sprinkler pipes or crane rails
- Column positions and the forklift aisle the cell must not block
- Slab thickness, if anyone knows it, and any trenches, cracks or old anchor holes
- Where power, compressed air and the network drop are now, and how far they have to run
The run-off in Fontana, the install in LA County
The finished cell runs your parts in our shop at the factory acceptance test, against criteria agreed before the build started. From most of the county that is a day trip. Bring the operator lead and the maintenance tech who will own the cell, because what they learn watching it fault and recover is worth more than a binder. Then the cell is split for the truck, installed and commissioned on your floor, and run through the site acceptance test with your crew and the machines on either side of it. How a project works with us lists what we need from you at each stage.
After handover, cells we install can be reached over a secure VPN connection for program changes and troubleshooting, if your plant allows it. When the work needs hands at the cell, it’s a drive.
Before the purchase order
Ask your CPA about California’s partial sales and use tax exemption for manufacturing equipment before the order goes out. The seller charges the lower rate once it has your signed exemption certificate, so it is easier to settle at purchase than to claim back later. Our California automation incentives guide lists the tests a purchase has to pass. While you’re at it, get the handover documents, the terms for the robot and PLC source code, and the support arrangements in writing before you sign.
To start, send a phone video of the manual process or a part drawing to sales@calwestmfg.com, or call or text (818) 397-4809. The contact page has the rest.
Common questions
- Do you have a shop in Los Angeles?
- No. Our only shop is at 13815 Arrow Rte in Fontana, about 47 miles east of downtown Los Angeles by road. Cells are designed, built, wired and programmed there and run off with your parts before they ship. The same team then drives out to install and commission the cell at your plant.
- Can the install fit around our production schedule?
- The install date is set around a window when your line can be down, such as a planned shutdown or a long weekend. Most of the work happens before that window: the cell is built and run off in our shop, and power, air, anchoring and network are ready at your end. The window itself is for setting the cell, connecting it and running the site acceptance test.
- Do you program Allen-Bradley and Siemens PLCs?
- Yes. We write PLC and safety logic for Allen-Bradley CompactLogix, ControlLogix and GuardLogix in Studio 5000, and for Siemens S7 in TIA Portal, and we connect PLC and robot over EtherNet/IP. If your plant has a controls standard, the cell follows it, so your maintenance team isn't handed a platform it doesn't already support.
- Can you work on a FANUC robot already on our floor in LA?
- Yes. We service and reprogram FANUC robots other companies installed, not only the cells we build: teaching a new part, adding iRVision, moving a robot or finding out why a cell has stopped. Call or text (818) 397-4809 with the robot model and what it needs. We don't promise response times, so ask what to expect for your job.