CalWest ManufacturingRobotics Fontana, CA

Call or text (818) 397-4809

Automation RFQ builder for a robot cell project

Answer what you know about the manual job you want a robot to take over. Your answers come out as one project brief that an integrator can quote from, ready to copy, print or email.

Nothing is uploaded. The brief is built in your browser and nothing is stored on our side. A draft stays in this browser so you can come back later, and you can clear it at the end of the form. The brief only reaches us if you email it.

No export-controlled data. Keep ITAR or EAR-controlled technical data out of this form and out of email. If the part or the process is controlled, call (818) 397-4809 before sending anything.

Skip anything you don’t know. The brief lists the key questions still open.

1You and the plant

City and state is enough.
For example “Line 3 case packing” or “Bracket deburr station”.

2The job done by hand today

From picking the part up to setting it down. Include anything they check, turn, reject or adjust.
Loose in a bin, on a conveyor, stacked in trays, out of a machine, by forklift.
Bad parts pulled, labels checked, orientation found by touch. These are the hard parts to automate, so list them.

3The part or product

Oily, hot, wet, fragile, food contact, finished faces that must not be marked.
Faces, holes or edges a gripper may touch, and any it must not.

4Sizes and weights

Include packaging if it is picked in its box or case.
For example, into a tight fixture, onto a conveyor, or square on a pallet layer. Leave it blank if you are not sure.

5Rates and shifts

Say what is counted: parts, cases, cycles.
Seasonal peaks, end-of-shift pushes, a faster line on order.

6Who runs the station now

Inspection, packing, labeling, moving material.
Who loads parts, clears a jam and changes over.

7Space and utilities

To the lowest beam, duct or light over the spot.
Columns, aisles, doors, overhead cranes, machines close by.
Thickness and condition, if you know them.
Voltage and phase, for example 480 V 3-phase.
Is it at the spot? Pressure, if you know it.
A drop at the spot, and whether the cell may join the plant network.
Heat, dust, washdown, food zone, unconditioned building.

8Safety and plant rules

Guarding your plant prefers or requires
Standards they reference, sign-off steps, lockout rules.
Hazardous locations, hot surfaces, sharp parts, noise, visitors on the floor.

9Controls standards

For example CompactLogix or S7-1500, and a software version if your plant requires one.
Panel brand and size, or the HMI software your plant uses.
We build with FANUC robots. Note it here if your plant specifies a brand.
Upstream and downstream equipment, and any signals you already know about.

10Data and ERP

What should the cell record or report?
Name and version, if you know them.
Reports people fill in today, labels, barcodes, traceability rules.

11Schedule and budget

A month or a quarter is fine.
Shutdown weeks or weekends when the line can be down.
Leave it blank if you would rather not say.

12What you will attach

Files you can send with the brief
What has been tried before, or what worries you about this project.

A draft of your answers is kept in this browser only.

What an integrator needs to quote a robot cell

In short

To quote a robot cell, an integrator needs to see the manual process and know the part and its variants, the sizes and weights, the rate and shifts, the space and utilities at the spot, your safety rules, your PLC and HMI standards, the data the cell has to report and the date you need it. Missing answers get priced as assumptions, which makes quotes hard to compare.

A handful of facts decide most of a cell. The heaviest part and the gripper decide the robot. The rate decides how many robots and how the parts are presented to them. The space decides the layout and the guarding. When a fact is missing, each integrator fills the gap with its own assumption, and the quotes you get back describe different cells. The robot cell cost breakdown shows which line of the price each answer moves.

A written brief also shows you which integrator read it. A good quote answers your questions back, names the robot and the PLC, and lists what it assumed. Our guide on how to choose a robot integrator covers what to ask when the quotes come in, including who designs, builds, wires and programs the cell.

If you send the brief to us, we come back with a cell concept and a plan: robot, tooling, controls and code. A review of that concept with your team leads to a firm quote. How we work goes through each stage, from the first video to the run-off in our Fontana shop and the install on your floor.

Common questions

Is anything I type sent to CalWest?
No. The brief is built in your browser and nothing is uploaded or stored on our side. A draft is kept in this browser’s own storage so you can come back to it, and “Clear the form” deletes it. The brief only reaches us if you choose Email to CalWest and send that email yourself, or pass on the copy or the PDF.
Can I send the same brief to other integrators?
Yes. The questions are what any integrator needs, and nothing in the brief is specific to us. Sending the same brief to each one makes the quotes easier to compare, because they all start from the same facts. Our guide to choosing a robot integrator covers what to ask when the quotes come back.
What if I can’t answer every question?
Send what you have. A video of the manual process or a part drawing is enough for us to start a concept, and the rest firms up the quote. The brief lists the key questions still open, so the integrator can ask about them on the first call instead of guessing.
Can I include ITAR or export-controlled drawings?
Not by email or through the website. CalWest Manufacturing, our parent company, is ITAR registered, but ordinary email is not a controlled channel. Call (818) 397-4809 before sending anything controlled. A first concept can often start from what your export-control officer is willing to release, such as overall size, weight, material and where the part can be held.
Why doesn’t the builder give me a price or a cycle time?
Both depend on the details this brief collects, and a number from someone else’s job would mislead you. The brief is what an integrator prices from. For a sense of what drives the cost first, the robot cell cost breakdown goes through the robot, gripper, guarding, controls, programming and install line by line.

Start a project

Bring us the process. We'll bring the cell.

Send a phone video of the manual process, or a part drawing, by text or email. We come back with a cell concept and a plan: robot, tooling, controls and code.

Call or text
Call or text
(818) 397-4809
Email
sales@calwestmfg.com
Shop
13815 Arrow Rte, Fontana, CA 92335
Hours
Mon–Fri 7:00am – 3:45pm

FANUC Authorized System Integrator (ASI). Part of CalWest Manufacturing, founded 2012: AS9100D and ISO 9001 certified, ITAR registered.