Automation RFQ builder for a robot cell project
Answer what you know about the manual job you want a robot to take over. Your answers come out as one project brief that an integrator can quote from, ready to copy, print or email.
Nothing is uploaded. The brief is built in your browser and nothing is stored on our side. A draft stays in this browser so you can come back later, and you can clear it at the end of the form. The brief only reaches us if you email it.
No export-controlled data. Keep ITAR or EAR-controlled technical data out of this form and out of email. If the part or the process is controlled, call (818) 397-4809 before sending anything.
Your project brief
Email to CalWest opens your own email program with the brief filled in, addressed to sales@calwestmfg.com. Attach your video, drawings or photos there before you send it. Nothing is sent until you press send.
What an integrator needs to quote a robot cell
In short
To quote a robot cell, an integrator needs to see the manual process and know the part and its variants, the sizes and weights, the rate and shifts, the space and utilities at the spot, your safety rules, your PLC and HMI standards, the data the cell has to report and the date you need it. Missing answers get priced as assumptions, which makes quotes hard to compare.
A handful of facts decide most of a cell. The heaviest part and the gripper decide the robot. The rate decides how many robots and how the parts are presented to them. The space decides the layout and the guarding. When a fact is missing, each integrator fills the gap with its own assumption, and the quotes you get back describe different cells. The robot cell cost breakdown shows which line of the price each answer moves.
A written brief also shows you which integrator read it. A good quote answers your questions back, names the robot and the PLC, and lists what it assumed. Our guide on how to choose a robot integrator covers what to ask when the quotes come in, including who designs, builds, wires and programs the cell.
If you send the brief to us, we come back with a cell concept and a plan: robot, tooling, controls and code. A review of that concept with your team leads to a firm quote. How we work goes through each stage, from the first video to the run-off in our Fontana shop and the install on your floor.
Common questions
- Is anything I type sent to CalWest?
- No. The brief is built in your browser and nothing is uploaded or stored on our side. A draft is kept in this browser’s own storage so you can come back to it, and “Clear the form” deletes it. The brief only reaches us if you choose Email to CalWest and send that email yourself, or pass on the copy or the PDF.
- Can I send the same brief to other integrators?
- Yes. The questions are what any integrator needs, and nothing in the brief is specific to us. Sending the same brief to each one makes the quotes easier to compare, because they all start from the same facts. Our guide to choosing a robot integrator covers what to ask when the quotes come back.
- What if I can’t answer every question?
- Send what you have. A video of the manual process or a part drawing is enough for us to start a concept, and the rest firms up the quote. The brief lists the key questions still open, so the integrator can ask about them on the first call instead of guessing.
- Can I include ITAR or export-controlled drawings?
- Not by email or through the website. CalWest Manufacturing, our parent company, is ITAR registered, but ordinary email is not a controlled channel. Call (818) 397-4809 before sending anything controlled. A first concept can often start from what your export-control officer is willing to release, such as overall size, weight, material and where the part can be held.
- Why doesn’t the builder give me a price or a cycle time?
- Both depend on the details this brief collects, and a number from someone else’s job would mislead you. The brief is what an integrator prices from. For a sense of what drives the cost first, the robot cell cost breakdown goes through the robot, gripper, guarding, controls, programming and install line by line.
